Prospects of intelligent synthesis mechanization on roadway drivage operation line

Abstract

The paper describes the state-of-the-art drivage line and intelligent roadheader by 12 aspects from home and abroad in the drift of coal mine.

INTRODUCTION

Roadway drivage of coal mining often faces numbers of arduous tasks and very complicated hazards-coal and gas outburst, rock burst, bursting water, obstructed view and noise etc., not to mention that the coal companies only focus on the efficiency of production. In light of those difficults, some coal mining equipment companies including a batch of the scientific personnel have been committed to improving the roadway drivage opration line.Particularly,lots of relatived theories and in-field instructive practices have been emerged in recent decade.The representative projects comprise of Europe’s ADRIS and NEMAQ(2007-2010)(Dr. J. Czwalinna, 2011)(Dr. Samir NABUSLI, 2012),Poland’s KOMAG (in collaboration with Silesian University) (Świder & Jasiulek, 2009),Australia’s CSIRO(Reid, 2010) and China’s“863/973 projects”(1-7) (Zhongguo, 2016),etc. These new system enhances safety in the mining operation, betters the miners’ working conditions, improves the quality of the extracted roadway, and increases drifting footage. This paper elaborates twelve aspects of the main achievements of the advanced drivage and intelligent roadheader at home and abroad.

1.the optimization of drum

The cutter picks’ strength has dramatically improved along with their stiffness and abrasive resistance. The new cutting tip materials namely PCD, Polycrystalline diamond composites has been used to to overcome the problem of premature failure. The application of the code simulation has largely shorten the research cycles as well as the expensive cost of blindfold test. These simulations have been used to correlate rock properties with pick forces, to study dust make and cutter wear and to simulate the interaction of picks on rotary machines. The experimented processes have been carried out purposefully and intentionally, such as in RAG, Sandvik and Ekhof etc. With these efforts, we have fulfilled a significant progress(8, 9) consist of torsional vibration cutting technique, High pressure water assisted cutting technique , Circular cutting knife, Vibrating disc knife and shock vibration technique etc., in which part of them have been applied on-sites but others are still testing. Building on its transformational DynaCut (Ostillating Disc Cutter, ODC)rock breaking technology, Joy Global has increased cutting rates by a factor of 10(10).

2.the identifying of coal and rock

Using the kinematics of the machine, Fraunhofer IML developed a 3D laser scanner system(as shown in Fig.2-1) scanning the heading face within the infrared spectrum. An integrated signal processor calculates the coordinates of the coal seam and transfers them to the control of the machine, which determines the ideal value for the next step of excavation(11). By turning the cutter boom in a horizontal way the scanners are able to sample the whole face in a 3D-manner.Such technique(12-14) include Infrared LADAR Imaging, Thermal imaging and shear fitting technique imaging,etc. The concept of virtual prototyping of a roadheader’s control system consisting in coupling the real PLC controller, made by WAGO, with the virtual machine with its surrounding was presented(Science, Yanjin, & Jianguang, 2015),in which simulation tests results will enable to verify the control procedures and the proper preparation to be carried out in mine underground. A laser transmitter (Yun, 2015)on the body of boom-type roadheader transmits the revolving laser planes, laser receivers installed behind the boom-type roadheader get the position of laser transmitters through laser planes, then obtain the position and attitude of boom-type roadheader in the roadway coordination frame constructed by laser receives. The approximate iterative method of MATLAB simulation(Hang, Shurong, & Jun, 2015) has been utilized to improve the forming accuracy including trapezoidal, circular arch or non rectangular section greatly and controlled within 1mm(15).

Fig.2-1 Position of the 2D-Laser scanners on the roadheader

3.the precise location and adjustment

The author put forward the specific control methods of pitch attitude compensation control and cutting boundary compensation control(Du, Zhang, Wang, Liu, & Wu, 2013). The Silesian University of Technology carried out a comprehensive range of on-site tests (Zhang, Zhang, & Xu, n.d.) to recognize the adapted advanced control algorithms, cutting resistance of mined rock and the cutter jib angular speed etc. Jia,Wenhao put forward a position and orientation measurement method of single-station, multipoint and time-sharing based on iGPS to locate roadheader body precisely(listing the other 3 methods) (16, 17).

As shown in Fig.3-1, The roadheader has been equipped with the sensors of the vertical and horizontal position of the cutter jib, a sensor of the loading table position, vibration sensors installed on the cutter head, an inclinometer to determine the position of the whole machine as well as with pressure sensors the hydraulic actuators.

Li,Jiangang and Mao jun conducted tracking control of automation roadheader by means of control mechanism and robust neural network to profile memory cutting(18).Using inverse transform and classic elimination theory, the kinematics of jumbolter mounted upon roadheader was precisely located(19).

Fig.3-1 Sensor installation set of the R-130 roadheader

a,b)Jib position sensor;c)Vibrations sensor;d)Loading table sensor;

e)Hydraulic pressure sensor;and f)Inclinometer

4.the reliable sensor and the date-processing method

By using the automatic positioning technology of the boring machine, the roadheader can automatically adjust the running mechanism,which is always in the ideal position of the design requirements of the roadway. As shown in Fig.4-1, total station, gyroscope, electronic compass, laser guiding instrument and visual measurement equipment and system are the main methods used in the current position and orientation(Maidl, Thewes, & Maidl, 2013). In the system infrared sensor with active illumination is applied to improve the reliability of positioning of the roadheader in the absence of visual control of the operator(Roman, Josif, & Nikolay, 2015). In the field implementation of the proposed solution wireless data communication enabled by ZigBee-based wireless sensor networks to collect the remote control real-time surveying results(Shen, Lu, Fernando, & AbouRizk, 2012). A multilayer perceptron(20) (MLP,analogy method of Artificial Neural Network) is a feed forward artificial neural network model that maps sets of input data onto a set of appropriate outputs (Jasiulek, Stankiewicz, & Street, 2011).

Fig.4-1 Different Sensors

5.the assisted parallel operation anchoring and the work face support

A patented laser light grid system has been developed by J.H. Fletcher and Monitech, a South African Company, to aid in proper machine positioning in the heading and proper bolt spacing(21). A kinematics model of 7 degree of freedom driving and anchor machine under the influence of roadheader pose were first established based on the D-H parametric method(Steiner, 2016).The jumbolter location was treated as known measurement.Using inverse transform and classic elimination theory,the inverse kinematics of whole machine was analyzed,as shown in Fig.5-1,5-2.

Fig.5-1 Dual arm concept design:a)Complete model;b)Jumbo arm;c)Miner arm.

Fig.5-2 Sensor functions of the drill boom control system;

Atlas Copco Deutschland GmbH.

A suspension hydraulic temporary support equipment(Jia-sheng & Ming-zhong, 2011) has been introduced,along with roof type and structure the dynamic roadway roof support design is achieved.

Fig.5-3 Temporary support equipment is retracted

  1. special suspension I-beams;2-connecting base;3-pushing cylinder;4-moving trolley;5-amplitude cylinder of supporting platform;6-non-fixed clamp;7-fixed clamp;8-supporting platform;9-leg amplitude cylinder;10-leg cylinder;11-amplitude cylinder of board to shield front wll;12-board to shield front wll;13-wall in roadway;14-hook;15-first elevating platform;16-second elevating platform;17-third elevating platform;18-roof bolt;19-roadway floor;21-rock or coal in roadway;22-roadheader

Through detection of roof type and structure,the situation that roadway support is designed by experience in coal mines can be changed, and dynamic roadway roof support design is achieved. Through matching of bolter and geological drilling rig, and roadheader, safe rapid support and excavation is achieved,as shown in Fig.5-3.

shift cylinders having the stroke of 300 mm

pipe-type guides

Four shift cylinders

Four identical inside sets

two marginal sets

Fig. 5-4 General view of six element set of the mechanized,temporary support,

according to the preliminary concept(International Mining Rorum 2011, 2010)

The manipulator or working platform moving on the rail suspended under the temporary support can be used for the support elements assembling and disassembling,as shown in 5-4.

Fig.5-5 Temporary self-advancing roof aid for the construction bolting support

The proposed temporary self-advancing roof support consists of the fixed roof shield and an expandable shield. The fixed and expandable shields are connected with its corresponding set of legs making a fixed frame and the expandable frame respectively. In the roof part of the support there should be places for the installation of the bolts and the advancing of the support should be able to avoid such installed bolts. After setting the frame against the roof the load is taken by the supporting bars which are the part of advancing system,as shown in Fig.5-5.

Fig.5-6 Bolting area layout---Belt moves, flits, relocations(CM2010)

Fig.5-7 Roof mesh carrier traverses machine

As shown in Fig.5-6,5-7,the part system of automation support mechanism consist of bolts transmission and mesh sticking the roof.

6.the technology of coal clearance

Refer to the coal clearance we should consider the efficiency to “ avoid large horse drawn trolley”,besides intelligent transportation line is the priority task that we should build them up to enhance the rate of output safety and the coincident response immediately.

The paper(22) describes the factors,affecting the rate of drivage operations,and offers the self-propelled bin-loader as part of the drivage plant for reduction of the sinking equipment downtime and support operations duration,as shown in Fig.6-1.

laser

self-propelled bin-loader

extension rod

airborne roofbolter

Fig.6-1 bump-bin and airborne roofbolter

7.the safe speedy transportation

Logistics play an important role in the integrated road- way drivage system. A typi- cal example of this development is greater component loads and increasing material transport. Monorail material transport systems have to meet these new challenges. The I140V+N (Fig.7-1) rail system is suitable for monorail conveyor operation with heavy trolley loads and frequent utilization in very inclined routes or with fast transport(Rautenstrauch & Kulassek, 2014).

P3020034

Fig.7-1 monorail systems

Besides,truck can also be used in the better geological conditions.On the contrary,we may adopted the continuous coal haulage(Joy 4FCT) (Fig.7-2) when encounter a turn or more of them(Zhang et al., n.d.).

Fig.7-2 Continuous coal haulage

8.the Efficiency of machine output

We should avoid overload and power-surplus when it comes to the efficiency of machine output.A roadheader performance prediction model was developed using ANN approach in which the ICR can be predicted more precisely. with MLP and KSOFM for supervised and unsupervised ones, respectively.The results showed that the neural network had a strong capability to predict and evaluate the performance of medium-duty roadheaders in coal measure rocks(Copur, Ozdemir, & Rostami, 1998).The results of full-scale rock-cutting tests conducted with aconical cutter(Copur, Tuncdemir, Bilgin, & Dincer, 2001) in the laboratory combined with geological and geotechnical information collected during mine visits have indicated that many mines in Turkey could be operated with partial-face excavation machines, such as roadheaders and impact hammers/breakers, and that acceptable production rates could be achieved.

A good relationship was found to exist between these two parameters and the machine power (P), weight (W) and the rock compressive strength (UCS). A measure of rock mass characteristics of the RQD value lead to the formulation of an accurate roadheader performance prediction model which can be used in different rock types where the roadheaders are economically applicable(Copur et al., 1998). Research (23)suggest that hard rock with the low speed and high torque while soft rock with the fast and efficient operation can reduce the wear and tear.The motor and transmission system vibration of the roadheader, does not need a two-speed motor to regulate speed in a traditional way,which is equipped with the power reflux hydraulic transmission system is markedly attenuated relative to the existing roadheader(Wang, Sun, & Qin, 2016).

9.the self-diagnosis of automation system(24)

10.the dust removing equipment- air curtain/ long pressure short evacuation/ air curtain/ foam water injection/ wet air blower

11.the pre-mining systems

Develop pre-mining systems, including gas drainage, seam dewatering, and the detection and pre-treatment of faults and other geological anomalies, to enable a safe, compliant and productive mining environment to be maintained.Such as shown in Fig.11-1,wheeling road concrete and dig ditch can be completed consequently when roadheader advanced(CM2010).

DSC01701

50MPA Concrete Laid up to the back of the Continuous Miner

Dig ditch

Wheeling Road Concrete

Fig.11-1 Auxiliary process

12.the others

The bringing together of knowledge from previous experiences on underground metalliferous and civil tunneling works (boring machine(Shen et al., 2012)), has enabled the development and implementation of alternative excavation systems to construct drifts to meet differing project objectives(Donnelly, 2014).Rock fracturing by plasma blasting technology is a new non-traditional rock breaking methods,in which the research was undertaken-thermal stress induced by dielectric or induction heating, plasma-hydraulic fracturing where a shockwave or pressure wave is derived from an underwater discharge or plasma, and open pulsed electrical discharge techniques. Other comminution and spalling mechanisms were also considered,including various ablation and microwave fragmentation methods(as shown in Fig.21-1, electrofracture equipment).

Fig.12-1 System overview of the high energy,EHT’phase III’Marx generator

CONCLUSION

The major improvements achieved in the last 50 years consist of steadily increased machine weight,size and cutterhead power,improved design of boom,muck pick up and loading system,more efficient cutterhead design,metallurgical developments in cutting bits,advances in hydraulic and electrical systems,and more widespread use of automation and remote control features. In comparison with other studies in this field(25),we characterized by partially researching,inferior field practice and lacking suitable reference theories,barely researching tools as well.Of course, geological conditions play a signification role as to whether we can deliver the rapid excavation line to the particular ones(26).For instance,mining conditions in the Xinwen Coal Group now and in the future will not normally favour bolter miners or continuous miners as bolting needs to be undertaken close to the face, with little delay. We can see advanced drivage and intelligent roadheader will progressively reduce the physical demands on personnel engaged in the development process and reduce their exposure to workplace hazards in the future coal mining industry.

Acknowledgements On the completion of my thesis, I am greatly indebted to my supervisor Prof. Ju who gave me valuable instructions. I would like to express my gratitude to Prof. Liu who has improved me in language. I also would like to thank my partner Slin and Pong for their friendship and suggestions. I appreciate the authors of the literatures who have greatly contributed to this paper.

References

1. 王伟. 智能化超重型岩巷掘进机动载荷识别系统的开发: 太原理工大学; 2015.

2. 杨仁树. 我国煤矿岩巷安全高效掘进技术现状与展望. 煤炭科学技术. 2013;41(9):18-23.

3. 王虹. 我国煤矿巷道掘进技术和装备的现状与发展. 煤炭科学技术. 2010;38(1):57-62.

4. 汪腾蛟. 新型高效单巷快速掘进系统应用及改进技术. 煤炭科学技术. 2014;42(5):121-4.

5. 张忠国. 煤巷快速掘进系统的发展趋势与关键技术. 煤炭科学技术. 2016;44(1):55-60.

6. 郝金龙. 我国煤矿高效掘进技术的现状与发展. 中国高新技术企业. 2011(4):119-20.

7. 李晋峰;王红斌. 潞安王庄矿建成自动化掘进工作面 2008,11 [Available from: http://www.ccoalnews.com/101785/101794/91741.html.

8. 非炸药破岩新技术: 中国矿业大学出版社; 2012.

9. 赵连城. 合金的形状记忆效应与超弹性: 国防工业出版社; 2002.

10. Joy. Joy Global introduces DynaMiner prototype featuring DynaCut technology for continuous hard rock mining 2016.9 [Available from: http://www.mining.com/web/joy-global-introduces-dynaminer-prototype-featuring-dynacut-technology-for-continuous-hard-rock-mining/.

11. huber D-ih. Sensor technology for intelligent mining roadheaders. Fraunhofer-Institut Für Materialfluss Und logIstIk IML. 2010:p50.

12. 邓国华. 基于激光导向器的悬臂式掘进机位置姿态自动测定方法. 工矿自动化. 2009;35(9):20-3.

13. 吴淼, 贾文浩, 华伟, 符世琛, 陶云飞, 宗凯, et al. 基于空间交汇测量技术的悬臂式掘进机位姿自主测量方法. 煤炭学报. 2015;40(11).

14. 符世琛, 李一鸣, 杨健健, 贾文浩, 陶云飞, 宗凯, et al. 基于超宽带技术的掘进机自主定位定向方法研究. 煤炭学报. 2015;40(11).

15. 田劼, 王苏彧, 穆晶, 吴淼. 悬臂式掘进机空间位姿的运动学模型与仿真. 煤炭学报. 2015;40(11).

16. 贾文浩, 陶云飞, 张敏骏, 李瑞, 吴淼. 基于iGPS的煤巷狭长空间中掘进机绝对定位精度研究. 仪器仪表学报. 2016;37(8):1920-6.

17. 贾文浩, 陶云飞, 符世琛, 张敏骏, 宗凯, 吴淼. 悬臂式掘进机位姿检测方法研究进展. 煤炭科学技术. 2016(s1):96-101.

18. 李建刚,毛君. 自动化掘进机仿形截割控制策略研究: 辽宁工程技术大学; 2012.

19. 毛君, 孟辉, 陈洪月, 张瑜. 掘进机机载锚杆钻机运动学分析与轨迹仿真. 机械设计. 2016(4):42-7.

20. Wikipedia. Multilayer perceptron. the free encyclopedia. 2016,8.

21. Kendall W. Use of a Laser Grid System for Accurate Roof Bolt Location. sciencenetcn. 2014.

22. V.A. L. Use of self-propelled bin-loader with loading platform as part of drivage plant for drivage efficiency and mining mechanization level improvement. Russion Coal Journal. 2016;No.6:pp.22-4.

23. 王焱金, 张建广, 马昭. 综掘装备技术研究现状及发展趋势. 煤炭科学技术. 2015;43(11):87-90.

24. 王馨乐. 煤矿设备故障诊断技术应用与发展探析. 内蒙古煤炭经济. 2016(z3).

25. 张建广. 悬臂式掘进机智能截割控制技术发展现状及关键技术探讨. 煤炭工程. 2015;47(2):89-91.

26. 王强. 现代复杂地质条件下的煤矿掘进支护技术的应用分析. 地球. 2015(6).

Copur, H., Ozdemir, L., & Rostami, J. (1998). Roadheader applications in mining and tunneling. Mining Engineering, (May).

Copur, H., Tuncdemir, H., Bilgin, N., & Dincer, T. (2001). Specific energy as a criterion for the use of rapid excavation systems in Turkish mines. Mining Technology, (December), 149–157. Retrieved from http://www.ingentaconnect.com/content/maney/mint/2001/00000110/00000003/art00003

Donnelly, C. (2014). Alternative excavation methods in undeground coal mining, 216–223.

Dr. J. Czwalinna, E. (2011). New mechanisation and automation of longwall and drivage equipment ( NEMAEQ ). RFCS publications Address: http://doi.org/10.2777/82921 ISSN

Dr. Samir NABUSLI, E. (2012). Advance drivage and roadheading intelligent systems ( ADRIS ). RFCS publications. http://doi.org/10.2777/24673

Du, Y. B., Zhang, W. Z., Wang, S. Y., Liu, X. G., & Wu, M. (2013). Control System of Pose Error Compensation for Roadheader Based on Multiple Parameter and Negative Feedback. Applied Mechanics and Materials, 373375, 1551–1558. http://doi.org/10.4028/www.scientific.net/AMM.373-375.1551

Hang, S., Shurong, N., & Jun, G. (2015). Application of Approximate Iterative Method on Section Precision Form- ing of Boom-type Roadheader, 1421–1428.

International Mining Rorum 2011. (2010). New Techniques and Technologies in Thin Coal Seam Exploitation International Mining Forum.

Jasiulek, D., Stankiewicz, K., & Street, P. Ĕ. (2011). AN ADAPTIVE CONTROL SYSTEM OF ROADHEADER WITH INTELLIGENT MODELLING, 18(2), 5–11.

Jia-sheng, C., & Ming-zhong, G. (2011). Research on integration of roadway excavation, bolting, support, and detection. Procedia Engineering, 26, 869–875. http://doi.org/10.1016/j.proeng.2011.11.2249

Maidl, B., Thewes, M., & Maidl, U. (2013). Handbook of Tunnel Engineering. Handbook of Tunnel Engineering, 1, 1–454. http://doi.org/10.1002/9783433603499

Rautenstrauch, O., & Kulassek, M. (2014). Equipment for underground roadway drivage: Products and engineering from Neuhäuser GmbH. Mining Report, 150(4), 228–233. http://doi.org/10.1002/mire.201400026

Reid, D. D. C. (2010). CSIRO - RGTG Operators Workshop Sept 2010. Retrieved from www.csiro.au

Roman, M., Josif, B., & Nikolay, D. (2015). Development of position system of a roadheader on a base of active IR-sensor. Procedia Engineering, 100(January), 617–621. http://doi.org/10.1016/j.proeng.2015.01.412

Science, C., Yanjin, W., & Jianguang, Z. (2015). Research Status and Development Tendency of Mine Fully - Mechanized Heading Equipment Technology.

Shen, X., Lu, M., Fernando, S., & AbouRizk, S. M. (2012). Tunnel boring machine positioning automation in tunnel construction. Gerontechnology, 11(2), 4017. http://doi.org/10.4017/gt.2012.11.02.558.00

Steiner, L. J. (2016). Kinematics analysis and track simulation of j umbolter m ounted on r oadheader. http://doi.org/10.13841/j.cnki.jxsj.2016.04.009

Świder, J., & Jasiulek, D. (2009). Use of a virtual prototyping in construction of a mining machine’s control system. Journal of Achievements in Materials and Manufacturing Engineering, 36(2), 160–167. Retrieved from http://w.journalamme.org/papers_vol36_2/3626.pdf

Wang, H., Sun, D., & Qin, D. (2016). A new continuously variable transmission system applied to transmission system of the roadheader’s cutting unit. Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science, 0(0), 1–11. http://doi.org/10.1177/0954406216649404

Yun-, T. A. O. (2015). Autonomous measurement of position and attitude of boom- type roadheader based on space intersection measurement.

Zhang, W., Zhang, D., & Xu, M. (n.d.). Fast Drivage Technology for Large Sections of Deep Coal-Rock Roadway in Complicated Geological Conditions, 1939–1950.

Zhongguo, Z. (2016). Development tendency and key technology of mine seam gateway rapid driving system, 5–10.